Call Us: (814) 452-4330 · info@mserie.com

Projects Completed

Ridg-U-Rak

MSSI won the competitive bid for the Ridg-U-Rak warehouse project in North East, Pennsylvania.  This large, 240,000 Sq/Ft warehouse was completed in 10 months by our in-house team.

  • 240,000 Sq/Ft Warehouse
  • 1450 Sq/Ft Interior Offices
  • Site Preperation
  • Long Bay Purlins
  • Storm Water Management with Retention Pond

Scroll Left/Right To See More

Silgan Plastics

Agracel came to MSSI to develop 135,000 Sq/Ft facility for Silgan Plastics.  Two years later, we added 101,500 Sq/Ft Warehouse to meet Silgan’s increased growth.

  • 135,000 and 101,500 Sq/Ft Warehouse
  • 8000 Sq/Ft Interior Offices
  • Pre-Engineered Metal Building
  • Loading Docks
  • Long-Bay Purlins

Scroll Left/Right To See More

Erie Brewing Company

Erie Brewing came to MSSI and we partnered in the design of a new brewery complex with restaurant, bar and processing areas.

  • 20,000 Sq/Ft Facility
  • 3,000 Sq/Ft Cooler
  • Exposed Aggregate Polished Concrete Floor
  • Fireplace
  • Mezzanine

Scroll Left/Right To See More

Tesco

Transportation Equipment Supply Company asked MSSI to complete a large warehouse addition to allow them to greater expand their manufacturing operations.  This project was completed start-to-finish in 9 months.

  • 36,000 Sq/Ft Warehouse Addition
  • Pre-Engineered Metal Building
  • Interior Loading Dock
  • Site Preperation
  • Storm Water Management
  • Interior 10ton Crane

Scroll Left/Right To See More

F&S Tool, Inc.

MSSI completed 22,500 Sq/Ft of manufacturing space for F&S Tool.  Later, an addition 22,500 Sq/Ft warehouse was added for expanded growth.

  • 22,500 Sq/Ft and 22,500 Sq/Ft buildings
  • Pre-Engineered Metal Buildings
  • 5 and 10 ton Interior Cranes
  • Polished Concrete Floors
  • Silo Foundations
  • 2-story Offices

Scroll Left/Right To See More

Greengarden Plaza

MSSI was asked to complete the construction of the new Greengarden Plaza retail complex.

  • 24,000 Sq/Ft
  • Engineered Metal Building
  • Brick and Pre-Cast Facade
  • 10 Retail Spaces
  • Storefront Doors and Windows with Awnings

Scroll Left/Right To See More

Cleveland Brothers

MSSI won the competitive bid for the contract to build Cleveland Brother’s new facility in Harborcreek, Pennsylvania. MSSI helped with value-engineering to stay within strict budgets.

  • 47,000 Sq/Ft building
  • Truck Wash
  • Mezannine
  • Pre-Engineered Metal Building
  • Interior Cranes

Scroll Left/Right To See More

Bay Valley Foods

MSSI has completed multiple projects with Bay Valley Foods ranging from large warehouse additions, interior coolers/freezers and interior build-outs for process manufacturing.

  • 88,000 Sq/Ft Warehouse Addition
  • Mayonaise Processing Line
  • Interior Offices
  • Loading Docks
  • Flooring Repairs

Scroll Left/Right To See More

Rehrig Pacific

McCormick Structural won the competitive bid to erect the pre-engineered metal build expansion for Rehrig Pacific.

  • 40,000 Sq/Ft
  • 48ft Eave Height
  • 50-ton Crane
  • Pre-Engineered Metal Building

Scroll Left/Right To See More

Pro Waste Services

Pro Waste Services needed a transfer station and decided that MSSI was the right fit. This is a three-sided building with a reinforced steel push wall.  One year later, an additional building was added on for their expanded operations.

  • 10,000 Sq/Ft & 7,500 Sq/Ft buildings
  • Steel Push Wall
  • 10″ Thick Reinforced Concrete Floor
  • 3-Sided Building

Scroll Left/Right To See More

Accudyn Products, Inc.

MSSI has complete multiple products with Accudyn Products, ranging from warehouse additions, interior engineering offices and building maintenance.

  • 12,500 Sq/Ft, 10,000 Sq/Ft and 4,800 Sq/Ft buildings
  • Completed During Winter Months
  • 10 Ton Crane

Scroll Left/Right To See More

West End Hardware

West End Hardware requested MSSI to complete additional warehouse storage.  This project was completed on-time and within strict budget guidelines.

  • 5,200 Sq/Ft
  • Connector to existing building
  • Extensive Site Preperation

Scroll Left/Right To See More

Erie City Mission

McCormcik Structural Systems, Inc. won the competitive bid for phase 1 of the Erie City Mission Project.

  • 17,780 Sq/Ft
  • Conventional Construction Techniques
  • Three Finished Floors
  • Connector to Existing Building
  • Elevator
  • Interior Finishes

Scroll Left/Right To See More

Harborcreek Youth Services

Harborcreek Youth Service asked MSSI to value engineer a multi-purpose gymnasium addition.  We completed this projects under budget and on-time.

  • 10,000 Sq/Ft addition
  • VCT Flooring Throughout
  • Multi-Purpose Interior Rooms

Scroll Left/Right To See More

Tri-Tech

Tri-Tech was in need of additional warehouse space for their expanding business operations.  MSSI helped with their needs and completed the project on-time and on-budget.

  • 33,000 Sq/Ft
  • Pre-Engineered Metal Building
  • Split Face Block Facade

Scroll Left/Right To See More

Eriez Magnetics

McCormick Structural Systems won the competitive bid for the expansion project at Eriez Magnetics.  We completed this project on-time and on-budget.

  • 24,150 Sq/Ft
  • Pre-Engineered Metal Building
  • Two connectors to existing building
  • Two 20-ton Cranes
  • Loading Dock
  • Front Facade

Scroll Left/Right To See More

Composiflex

Composiflex was in need of additional manufacturing space for their expanding business operations.  McCormick Structural Systems easily completed their additional space.

  • 19,800 Sq/FT
  • Pre-Engineered Metal Building
  • Interior Crane
  • Extensive Site work
  • Poured Concrete Foundation Walls

Scroll Left/Right To See More

Graham Packaging

MSSI partnered with Graham Packaging to complete a warehouse and processing facility for their food-grade operations.

  • 20,250 Sq/Ft
  • Pre-Engineered Metal Building
  • Loading Docks

Scroll Left/Right To See More

What Can We Build You Today?